The executed projects

 

Ovarall background of “Intereng-Almaty” during last 10 years

 

Stage. Name of works/services

Client Name

Year of completion and scope of work

132

“Development of Design-estimate documentation for construction of encircling railway line bypassing railway junction Almaty-1”

Branch of “NC “KTZh” – “Division of engineering and capital construction”,

Phone  606-847

Topographic & geodetic surveys;

Geotechnical works;

Main design solutions;

Additional acceptance-dispatch yard;

Railtracks; Motorroads;

Rearrangement and protection of gas pipeline at crossing with railways;Engineering structures; Signalling and interlocking;

Rearrangement of telecom line; Telecom equipment; Contact network; Power supply and lighting; Pneumatic delivery; General layout; Rail control center; Fitters point for contact network and network area; Compressor unit with UZOT; Sewage pump station; Treatment units;HVAC, External heat supply systems

131

“Development of Design-estimate documentation for construction of additional acceptance-disatch yard at Saryagash Station.

Branch of “NC “KTZh” – “Division of engineering and capital construction”,

Phone  606-847

Topographic & geodetic surveys;

Geotechnical works;

Main design solutions;

Additional acceptance-dispatch yard;

Rail tracks; Motor roads;

Rearrangement and protection of gas pipeline at crossing with railways;Engineering structures; Signalling and interlocking;

Rearrangement of telecom line; Telecom equipment; Contact network; Power supply and lighting; Pneumatic delivery; General layout; Rail control center; Fitters point for contact network and network area; Compressor unit with UZOT; Sewage pump station; Treatment units;HVAC, External heat supply systems

130

DD. “Construction of MPDC with arrangement of diagnostics at Atbasar-Tobol section”

 

“NC KTZh” JSC,

 

 

 

2012.

Development of detailed design for microprocessor dispatch signalling system with diagnostics equipment at Atbasar – Tobol section.

System of for microprocessor dispatch signalling with application of dispatch system by “ТЕSАКZ-POLIVID” consortium (“Astana” MPDS) is being developed, its interfacing with all existing automation systems: electric centralized control, automatic interlocking, crossing signalling, hotbox control, KGU, UKSPS is being performed.

The following disciplines were designed:

•              Automatics and telemechanics;

•              Architectural and construction solutions;

•              Power supply and lighting;

•              Telecom equipment;

•              Construction costs calculation;

•              Construction arrangement;

•              Environmental impact assessment.

State Project Expertise

129

DD “Modernization of Dispatch Signalling system at Kokshetau – Petropavlovsk section”

 

“NC “KTZh” JSC

 

2012

Development of detailed design for microprocessor dispatch signalling system at Kokshetau – Petropavlovsk section.

System of for microprocessor dispatch signalling with application of dispatch system by “ТЕSАКZ-POLIVID” consortium (“Astana” MPDS) is being developed, its interfacing with all existing automation systems: electric centralized control, automatic interlocking, crossing signalling, hotbox control, KGU, UKSPS is being performed.

The following disciplines were designed:

•              Automatics and telemechanics;

•              Architectural and construction solutions;

•              Power supply and lighting;

•              Telecom equipment;

•              Construction costs calculation;

•              Construction arrangement;

•              Environmental impact assessment.

State Project Expertise

128

TPD and DD for construction of main fiber optic telecom line (FOTL) at "Uralsk - Aksai" section, West-Kazakhstan Oblast.

“KazTransCom” JSC

+7 727 2 377-469

2012

Development of design-estimate documentation for construction of mainline FOTL under the following scope:

·         Topographic and geotechnical works;

·         Engineering of linear telecom structures;

·         Engineering of station telecom facilities;

·         HVAC, construction solutions on telecom rooms and facilities;

·         Construction cost calculations;

·         Construction arrangement;

·         Environmental impact assessment.

Approval of the accepted design solutions with concerned State and related bodies;

State Project Expertise.

127

DD  “Construction of FOTL for physical separation of inlet and outlet routes of FOTL type ТАЕК-701 and outlet NISM К-705 in Saryozek village”

“Kazaktelecom” JSC

 

2012

Development of design-estimate documentation for arrangement of separation of of inlet and outlet routes of FOTL type ТАЕК-701 and outlet NISM К-705 in Saryozek villagewithin the following scope:

·         Topographic and geotechnical works;

·         Engineering of linear telecom structures;

·         Construction cost calculations;

·         Construction arrangement;

·         Environmentalimpactassessment

Approval of the accepted design solutions with concerned State and related bodies;

State Project Expertise.

126

TPD and DD for designing of main fiber optic telecom line (FOTL) at “Aktobe-Kandyagash” section

“Transtelecom” JSC

 

2012

Development of design-estimate documentation for construction of mainline FOTL under the following scope:

·         Topographic and geotechnical works;

·         Engineering of linear telecom structures;

·         Engineering of station telecom facilities;

·         HVAC, construction solutions on telecom rooms and facilities;

·         Construction cost calculations;

·         Construction arrangement;

·         Environmental impact assessment.

Approval of the accepted design solutions with concerned State and related bodies;

Land use project;

State Project Expertise.

125

   TPD and DD on engineering structures for

  “Construction of railway line Zhezkazgan - Beineu. Beineu-Sekseul;skaya section

   (0÷280 km)”

 

“”Transproekt-K” LLP

 

2012

Development of design documents on thefollowing sections:

Engineering structures (bridges, culverts);

Construction costs

124

“Facility “Arrangement of reserve alignments К-701, ТУСМ-1”;

 

 

“KAZAKTELECOM” JSC

+7 727 266 3317

2012.

Development of detailed design for fiber optic cable crossings (reserve alignments) across Kaskelen river and dry riverbed with the following design and survey works:

·         Topographic surveys along the fiber optic cable route;

·         Geotechnical surveys along the fiber optic cable route;

·         Detailed design foir construction of linear structures by GNB method, selection ofr materials and equipment, construction costs;

·         Sections on environment protection (EP) and construction arrangement (CA) were developed.

State Expertise of the project is in process.

123

Reconstruction and extension of rail tracks under the project of KPA construction at Atyrau Refinery in the RoK”

 

Kazakh branch SE of Sinopec Corporation

 

Cheng Fuqiyang

7 777 80 89 6661

 

2012.

Development of detailed documentation under the project on extention of Atyrau Refinery:

Rail tracks;

Automation and telemechanics (arrangement of crossing signalling system, electric interlocking of switches and signals);

Telecom arrangements (linear structures);

Process solutions;

Power supply and lighting.

122

Design and survey works on detailed design for “Construction of rail tracks for “Zholashar-ZhD Service” at Almaty-2 Station

“Zholashar-ZhD Service” LLP

+7 727 3792569

2012.

Development of the following sections:

·        Topogeodetic surveys;

·        Rail tracks;

·        Environmental Impact Assessment;

·        Approval of DD with concerned authorities;

·        State Project Expertise

121

Engineering surveys for development of project “ Capital repair with substitution of insulation at Tengiz-Novorossiysk pipeline at section 390-452km”

“CA NIPI“TransNeft”

2012.

Topographic and geotechnical works

120

. Eskene West Rail Project.

Detailed Design of Railway Infrastructure 

“WorleyParsons Kazakhstan” LLP

2011

TPD, DD;

General Layout, Track Arrangement Layout, Longitudinal Profile; Architectural and Construction Solutions, Office and Plant Buildings; Electric Interlocking; Signalling; Telecommunication; Power Supply and Lighting; Production Process; Weighbridge; Culverts under Railways; Linear Cable Structures; Fire Alarm; Rearrangement and Protection of oil pipeline, gas pipeline and water pipeline at crossings with railways; Rearrangement if fiber optic lines at crossings with railways; HVAC

119

“Reservation of red light at entrance signal “Ч” of Tengiz station”;

“Arrangement of automatic signalling for crossings:

- Crossing at railway siding 400 of Tengiz station;

- Crossing located southwards from rail weighbridge No.4 (7430-5262) at Tengiz station.

“TENGIZCHEVROIL” LLP

2011

Collection of primary data (survey of power cable laying route for relay box of entering light signal, approval of the route by Client);

• General Data;

• Station Principal Diagram;

• Station Two-line Diagram;

• Cable Systems;

• Schematic Diagram of entering light signal Ч;

• Feeding unit;

• Installation diagram for relay box of entering light signal Ч;

• Installation layout of marshalling rack;

• Specification of equipment and materials

118

Development of technical passport for Zhanatas-Suzak railway section and development of design estimate documentation for medium repair of railway track superstructure.

“Trade-transport Company” LLP

 

I. Collection of primary data. Availability and technical condition of marks of State Geodetic system or client’s geodetic system, polygonometric points and elevation grades

II. Execution of engineering geodetic works

III. Development of design estimate documentation for medium repair of rail tracks.

Medium repair of rail tracks is generally intended for improvement of ballast body by cleaning of crushed stone ballast (or renewal of polluted ballast). In course of medium repair the following works are made: improvement of joints with straightening  of distorted rail ends and their overlaying; change of unfit sleepers and joints; addition (if required)of ballast to track; making hadal cards for timber sleepers and adjusting pads for reinforced concrete sleepers; adjustment or flattening of joint gaps; overall straightening of tracks with recovery of final grades; lubrication and fastening of terminals, embedded and joint bolts; correction of design outlines of circular and ease curves; repair of crossings; cleaning of ditches and other drainage facilities; grading of roadsides; grinding of rails, etc.

- Construction cost calculation

117

Development of detailed design “Construction of international tourist center “Zhana-Ile” on shore of Kapshagai water reservoir of Almaty oblast.

 

The RoK Ministry of Tourism and Sport

Development of draft construction plan and main technical and economic performance. Preliminary agreement of construction draft with Client and concernedbodies(solutions on rail tracks and infrastructure);

Development of detailed design;

- In compliance with General layout principal architectural and planning solution is issued for functional zoning of the area.

- Detailed proposal is developed on architectural and planning and volume-spatial solution for construction at design area.

- Plot plan of building lines of main streets was developed considering traffic flows.

Disciplines of land improvement, planting, engineering preparation of area, transport servicing and engineering equipment were developed.

Completed project is approved in established order with authorized bodies as well as architectural bodies and Client.

116

Development of design and estimate documentation on construction of project: “Freight traffic road from Gatehouse-1 to detour road”

“International  Center  of Cross-border Cooperation “Khorgos” JSC

Topographic, geodetic, geotechnical and hydrologic engineering works within a scope required for designing;

Development of DD:

- Layout and longitudinal profile of motor road;

- Roadbed, water discharge;

- Engineering protection of the area;

Due to facility location along Khorgos river, activities on engineering protection of the area by a dike dam was constructed with height and reinforcement taken on the base of calculations.

- Land allotment and recultivation.

- road pavement (according to calculation);

- Engineering structures (according to completed engineering surveys on the base of hydrological calculations);

- Abutments and crossings.

- Rearrangement and protection of crossed engineering systems and communications;

- Power supply and lighting;

- Developed in interfacing with video surveillance systems at ICCC “Khorgos”.

- Fencing of motor road from both sides is considered;

- Road improvement. Arrangement of safe traffic;

- Approval of DD with concerned parties and the RoK National Security Committee;

115

Detailed Design. Design and survey works on construction oаfiber optic line “Uralsk – Border of Russian Federation (Ozinki village)"

“KazTransCom” JSC

- Collection of primary data and surveying of design area;

- Office study on main fiber optic line (FOL) route laying,  inspection of mainline crossing with on-ground and underground utilities, revelation of companies – owners of these utilities, preliminary agreements on obtaining technical specifications for cable crossings;

- Survey works on telecom junction in Uralsk;

-  Approval of the route with local executive authorities and obtaining of cadastral maps of land plots that will be crossed by fiber optic cable.

- Development and signing of route selection statement for designed fiber optic cable.

- holding geotechnical surveys along the route of designed cable with indication of all crossings with utilities and locations of owners of these crossings;

- Allong all the FOL route geotechnical reconnaissance is made;

- Drilling works;

- designing of such disciplines as power supply, HVAC, architectural and construction solutions.

- cost estimates on all the project disciplines;

-Construction arrangements;

-Environmental Impact Assessment

114

Development of design and estimate documentation onimplementation of trains’ axis counting system with replacement of automatic interlocking by microprocessor semi-automatic interlocking at Semei-Lokot railway section.

“NC “KTZ” JSC

Designing of section’s equipment with devices of microprocessor semiautomatic interlocking (MSI).

Project is completed within existing track arrangement.

Locations of designed Signalling equipment are defined on the base of survey.

The project includes:

- Interfacing of MSI with existing Signalling systems;

- allocation of station’s MSI equipment in existing relay premises;

- installation of axle counters for rail stage control;

- laying of mainline cable in the area;

- overlapping of microprocessor interlocking system in the area with Control Center (CC) at Semei station;

- tele-control and tele-signalling for all operation points of the section;

- independent power supply for MSI equipment from uninterruptible power supply for up to 8 hours;

- arrangement of crossings with system of automatic signalling with rail circuits;

- control under crossing signalling at closest operation points to DNC;

- protection of ESSO  system, MSI equipment  from overloading using effective schemes and advanced systems of lightning protection;

- 10% production reserve of all used signalling equipment;

- stands for checking of equipment and MSI equipment, of ESSO system;

 -  maximum application of cable types and grades manufactured by the RoK plants.

113

DD “Arrangement of dispatchers’ and operation-process public communication and alarm system at facilities of Western branch of “KazTransOil” JSC

“KazTransOil” JSC

- Review of primary data and survey of design area;

- Office study of telecom cable route

- Survey works on MNU area, approval of locations for designed equipment installation;

- Execution and signing of survey statements; 

- cost calculations on all project disciplines;

- execution of DD, with approval by client and all concerned bodies;

- designing of power supply systems;

- Construction Arrangement; Environmental Impact Assessment, Sanitary-epidemiological station

112

Construction of roads in Karasu micro-district. Rearrangement of telecom and power supply lines at crossings with motor roads.

 

“Ingtranscom” LLP

 

- Collection of primary data and surveying of design area;

- Execution of project on relocation and rearrangement of telecom and power supply lines;

- Approval of DD with all concerned bodies and local executive authorities;

- cost estimates on all project disciplines;

 

111

Development of design and estimate documentation onconstruction of motor road crossover at motor road “Zhezkazgan – Yesil – Petropavlovsk”

“Kazakhmys Corporation” LLP

2011. Topographic, geodetic and geotechnical works. Construction solutions on the crossover, cost estimate documentation.

110

Detailed Design (DD) “Construction of motor road from Atyrau-Astrakhan mainline towards S. Balgimbayev Field”.

“RD “KazMunaiGaz” JSC

2011. Topographic, geodetic and geotechnical works. Construction solutions on motor road reconstruction(layout, longitudinal profile, widening of roadbed, road pavement, traffic arrangement safety), engineering structures, rearrangement and protection of utilities, cost estimate documents.

109

DD “Development of Design Estimate Documentation for construction of railway crossover аand motorway crossover in section between stations “Novaya” and “Mednaya” on railway towards “Zhomart” minery.

Corporation "Kazakhmys"LLP

2011. Development of technical solutions on construction of new railway and motorway crossovers.

108

DD “Development of Design Estimate Documentation for construction of microprocessor system of interval regulation of trains traffic at Kandyagash-Nickeltau section”

“Intranskom” JSC for

NC "KTZ" JSC

- “Directorate on designing and capital construction”

2010-2011. Topographic, geodetic and geotechnical works. Development of Design Estimate Documentation for construction of microprocessor system of interval regulation, architecture & construction solutions on rail control centers, power supply, engineering systems and utilities, signalling and telecom, cost estimate documents.

107

DD “Development of Design Estimate Documentation for construction of Fiber Optic Line (FOL) “Aksai - Aktobe”

DD “Development of Design Estimate Documentation for construction of Fiber Optic Line (FOL) “Aktobe - Zhanazhol”

“KazTransCom” JSC

2010-2011. Topographic, geodetic and geotechnical workson cable route. Development of technical solutions on telecom cable construction, architecture & construction solutions, power supply, cost estimate documents.

106

DD “Construction of new railway line Zhetygen-Korgas” – the RoK State Border. Engineering Structures. Bridge at “Iintal crossing loop – Altynkol Station” stage

“Transproekt-K” LLP

2010. Topographic, geodetic and geotechnical works, hydrologic calculations, development of documentation for bridge construction with calculations and justification of structures, cost estimate documents.

105

DD  “Modernization of interlocking system at “Yeginsu” Station.

“Zholarna” LLP

2010. Development of construction documents for signalling discipline (electric interlocking). Cost estimate documents.

104

Inspection of engineering structures and roadbed at “Sary-Ozek – Matai” section.

NC "KTZ" JSC

 “Mainline System Department”

 

2010,

Inspection of engineering structures(culverts and bridges), roadbed, regulating facilities (dike dams, etc.). Development of report on investigation results with recommendations on recovery of damage caused by flood flow of 2010.

103

DD “Recovery of bridge on 1324 km  PK3 of Yeginsu-Alazhide stage of branch “Matai track Division”

“NC “Kazakhstan Temir Zholy” JSC

Mainline Network Directorate

2010.

Development of technical solutions on construction of new bridge, temporary detour track, cost estimate documents.

102

Author supervision under project “Overhaul repair of bridge at Picket 8, km 1265 on uneven track of Sary-Shagan – Shyganak section”

“Kazstroyinvest– LTD” LLP

2009.

Author supervision under construction.

101

Concept Study “Kashagan Field Development Design Experimental Program. Railway Complex"

“Worley Parsons Kazakhstan” LLP

2010. Engineering services. Development of Concept Options for railway infrastructure(railway tracks, locomotive and wagon facilities, signalling and telecom, architecture & construction solutions, power supply, general layout and motor roads, construction costs) within various volumes of oil products transportation without consideration of loading-unloading facilities and relevant infrastructure.

100

DD “Abutment of railway siding of “Bulandy-Astyk” LLP at Makinka Station. Development of Signalling discipline.

“Railway Construction and Repair” LLP

2010. Development of construction documents on the following disciplines: railway tracks, signalling. Cost estimates.

99

DD “Construction of new railway line Zhetygen-Korgas” – the RoK State Border. Engineering Structures.

“Transproekt-K” LLP

2010.  Development of technical solutions and documents on construction of engineering structures (bridges and culverts), construction costs.

98

DD “Construction of railway automation at railway crossing at Panfilov str., Bishkek-2 Station”

State Company “NC “Kyrgyz Temir Zholu”

2010. Development of signalling discipline, cost estimate documents.

97

DD “Infrastructure Arrangement at “Pavlodar” railway junction and railway stations at Astana-Pavlodar-Mai section

NC "KTZ"JSC

 

2010. Survey of design area, topographic and geodetic layouts, development of secondary data transmission network (SPD) of NC "KTZ" JSC in the area using STM-4 equipment (mainline primary telecom network), arrangement of connection of automated workstations for NC "KTZ" JSC services, cost estimate documents.

96

DD “Correction of design estimate documentation on construction of wagons relocation point at Dostyk station. Signalling and telecom arrangements”.

“ABK-Nerud” LLP

2010. Development of DD discipline – Signalling and telecom arrangements, architecture & construction solutions on office and plant buildings, general layout and land improvement, cost estimate documentation.

95

Development of Design-estimate documentation for construction of a crossing loop at Ganyushkino – Junction No.7 railway stage.

“NC ”KTZh” JSC

2009.  Topographic and geotechnical surveys.

Development of documentation for construction of a new operation point on disciplines – rail tracks, automatics and telemechanics equipment  (electric interlocking and centralized dispatch), architectural and construction solutions on Rail Control Center and auxiliary facilities, power supply and lighting, engineering. Cost estimate calculations..

Development of sections Environment Protection (EP) and Construction Arrangements (CA).

Obtaining of conclusion of State Project Expertise.

94

Feasibility Study (Front End Engineering Design) Traffic Capacity of “NC “Kazakhstan Temir Zholy” JSC Mainline Tracks

Agip KCO

 

2009-2010. Calculation of existing and required traffic capacity of mainline tracks along oil-transportation routes from Kashagan field, defining need in expansion.

Economy and traffic arrangement, railway tracks, locomotive and wagon facilities, signalling and telecom,power supply and lighting, engineering systems and utilities, costs of infrastructure expansion.

93

Author supervision under construction:

Construction of engineering structure at 347km of PK 4-9 of Beineu-Mangystau section”;

Construction of engineering structure at 345km of PK 8-9 of Beineu-Mangystau section”

“Bridge construction Division “FERRO” LLP

2009. Author supervision under construction.

92

Author supervision under “Overhaul repair of bridge at even track of PK 3 of Shymkent – Tyulkubas section of Shymkent track Division”

“Kazinvest-Astana” LLP

2009. Author supervision under construction.

91

Author supervision under “Overhaul repair of bridge at even track of PK 8 of Arys – Shynkent section of Shymkent track Division”

“Kazinvest-Astana” LLP

2009. Author supervision under construction.

90

DD “Construction of reloading area No.8 at Dostyk Station. Signalling”.

“SaNur” LLP

2009. Designing of signalling discipline.

89

Author supervision under “Overhaul repair of culvert at 266 km of PK8 of Beineu – Mangystau section”

“Bridge construction Division “FERRO” LLP

2009. Author supervision under construction.

88

Author supervision under overhaul repair of bridge at even track of PK 10, km 1098 of Astana – Almaty section

“Zhan-Ai” LLP

2009. Author supervision under construction.

87

Author supervision under “Overhaul repair of culvert at PK8, km 284км,  PK8 km 281, PK8 km 285, PK1 km 286, PK 3 km 303 of of Beineu – Mangystau section of Mangystau track Division”

ElAS Corporation

2009. Author supervision under construction.

86

DD  “Railway infrastructure – signalling and telecom arrangements”

“Saulet” LLP

2009. Designing of signalling discipline, cost estimate documentation.

85

DD “Overhaul repair of bridge on Picket 8, 1265; 1375 km of uneven track at Sary-Shagan – Shyganak-Shu of “NC “KTZ” branch – Shyganak track Division”

NC "KTZ"JSC

2009. Topographic, geodetic and geotechnical works. Construction solutions on overhaul repair of bridge, construction costs.

84

DD “Overhaul repair of bridge on Picket 6, 1340 km of even track at Tyulkubas – Zhambyl section of “NC “KTZ” branch – Tyulkubas track Division”

NC "KTZ"JSC

2009. Topographic, geodetic and geotechnical works. Construction solutions on overhaul repair of bridge, construction costs.

83

DD “Enclosing and warning signalling systems arrangement on galleries and tunnel at 23 km of the Zaschita – Zyryanovsk section in East-Kazakhstan oblast forbranch of “NC “KTZ” JSC “Serebryansk Track Division”.

NC "KTZ"JSC

 

2009. Construction solutions onsignalling arrangement, construction costs.

82

TPD “Railway infrastructure – signalling and telecom arrangements”.

“Saulet” LLP

2009. Designing of signalling systems, cost estimate documentation.

81

DD “Correction of design estimate documentation on overhaul repair of bridge on 15024+33,00 of even track at Almaty-Astana section of “NC “KTZ” branch – Shu track Division”

NC "KTZ"JSC

2009. Topographic, geodetic and geotechnical works. Correction of construction solutions on the bridge and cost estimates.

80

DD “Overhaul repair of culvert at 2767 km of Picket 2 of Zhusaly – Kyzylorda section of “NC “KTZ” branch – Kyzylorda track Division”

NC "KTZ"JSC

2009. Topographic, geodetic and geotechnical works. Correction of construction solutions on the culvert and cost estimates.

79

DD “Correction of design estimate documentation on overhaul repair of bridge on Picket 4, 3367 km of Shymkent – Tyulkubas section of “NC “KTZ” branch – Shymkent track Division”

NC "KTZ"JSC

2009. Topographic, geodetic and geotechnical works. Correction of construction solutions on the bridge and cost estimates.

78

DD “Correction of design estimate documentation on overhaul repair of culvert at Picket 5, 1579 km of Sary-Ozek – Almaty section of “NC “KTZ” branch – Almaty track Division”

NC "KTZ"JSC

2009. Topographic, geodetic and geotechnical works. Correction of construction solutions on the culvert and cost estimates.

77

Author supervision under “Arrangement of warning and limiting signalling at bridge km117”

Author supervision under “Arrangement of warning and limiting signalling at bridge km177 of Zaschita – Zyryanovsk section

“Open Technology Plus” LLP

2009 Author supervision under arrangement of signalling.

76

Breakdown, control under completion of curved foundations and retaining walls for “Crossover through Gatehouse (tunnel) PK 19+19,42 approach No. 2»

“MO-1” LLP

2009. Engineering geodetic works under completion of project technical solutions.

75

Geotechnical Survey on “Construction of reloading area No.8 at Dostyk Station“

“SaNur” LLP

2009. Geotechnical works (survey, investigation and laboratory study).

74

Author Supervision “Marshalling Yard construction site preliminary preparation”

Agip KCO

 

2009. Author Supervision under earth works.

73

DD “Kashagan Field Development Design Experimental Program. Railway Complex”.

Railway Transport”.

Agip KCO

 

2009. Complex of facilities on construction of Agip KCO’s OPF Plant rail infrastructure:

Connecting track of Karabatan Station, rearrangement of interlocking system at adjacent stages (plan and longitudinal profile, roadbed, track superstructure, engineering structures, signalling and telecom arrangements, power supply);

Marshalling Yard  (track arrangement, roadbed, engineering structures, signalling and telecom arrangements, power supply and lighting, locomotive and wagon facilities, architecture & construction solutions on office And plant buildings (Rail Control Center, Maintenance point, Covered point of locomotives servicing, etc.) general layout, detailed land planning, intrasite motor roads and driveways, land improvement);

Rail Loading Facility tracks  (track arrangement of oil-loading gantries, sulphur loading facilities,  roadbed, engineering structures, signalling and telecom arrangements, power supply and lighting, intrasite motor roads and driveways);

External motor road (roadbed, road pavement, arrangement of traffic safety).

72

Author supervision under "Overhaul repair of crossover at motor road "Detour road to Atyrau"

NC "KTZ"JSC

2008. Author supervision under overhaul repair of crossover.

71

DD “Modernization of electric interlocking system and new Railway Control Center construction at Dostyk st.

NC "KTZ" CUKS

 

2008. Topographic, geodetic and geotechnical works.  Construction solutions on Dostyk Station – additional track arrangement, modernization of electric interlocking, new Rail Control Center, power supply and lighting, HVAC, sewage and water supply, signalling and telecom, construction costs.

70

DD “Recoveryof bridge at km 332 PK7 of Shetpe - Mangyshlak stage after flooding”

NC "KTZ" JSC, Mainline System Directorate

2008 г. Topographic, geodetic and geotechnical works.  Construction solutions on the bridge, construction costs.

69

DD “Installation of uninterruptible power supply at stations and MPC-Dialog of the new railway line “Shar st. – Ust-Kamenogorsk st.”

Doszhan Temir Zholy JSC

 

2008. Construction solutions on installation of uninterruptible power supply sources for microprocessor interlocking system, construction costs.

68

TPD “Construction of the Eralievo – Kuryk new railway line”.

Astana-AREK LLP

2008. Topographic, geodetic and geotechnical works. Economy and traffic arrangement, railway tracks, stations, locomotive and wagon facilities, signalling and telecom, architecture & construction solutions, motor roads and driveways, general layout, detailed planning and land improvement, construction costs.

67

DD “Construction of new bridge through channel of  Kedei river at encircling railway track at the Kyzyltu field” in Ereimentausky region of Akmolinskaya oblast

“Kyzylty”LLP

2008. Topographic, geodetic and geotechnical works. Economy and traffic arrangement, railway tracks, station, wagon facility, signalling and telecom, architecture & construction solutions, general layout , detailed land planning, motor roads and driveways,  land improvement, construction costs.

66

TPD “Kashagan Field Development Design Experimental Program.

Railway Complex. Railway Transport”.

NIPIneftegas-Agip KCO

 

2008. Complex of facilities on construction of Agip KCO’s OPF Plant rail infrastructure:

Connecting track of Karabatan Station, rearrangement of interlocking system at adjacent stages (plan and longitudinal profile, roadbed, track superstructure, engineering structures, signalling and telecom arrangements, power supply);

Marshalling Yard  (track arrangement, roadbed, engineering structures, signalling and telecom arrangements, power supply and lighting, locomotive and wagon facilities, architecture & construction solutions on office And plant buildings (Rail Control Center, Maintenance point, Covered point of locomotives servicing, etc.) general layout, detailed land planning, intrasite motor roads and driveways, land improvement);

Rail Loading Facility tracks  (track arrangement of oil-loading gantries, sulphur loading facilities,  roadbed, engineering structures, signalling and telecom arrangements, power supply and lighting, intrasite motor roads and driveways);

External motor road (roadbed, road pavement, arrangement of traffic safety).

65

TPD, DD “Construction of fiber optic line ot Shu-Arys-Saryagash section with output to Tashkent, 727 km”.

“Giprosvyaz” LLP

2008. Topographic, geodetic and geotechnical works on telecom cable route. Construction solutions on telecom cable route, equipment and materials, rearrangements, construction costs. Architectural and construction solutions on telecom buildings, general layout and land improvement.

64

Feasibility Study “Electrification of railway sections Aktogai - Almaty, Aktogai - Dostyk and Aktogai – Mointy”

 

NC "KTZ" CUKS

 

2008. Economy and traffic arrangement, railway tracks, station, wagon facility, signalling and telecom, architecture & construction solutions, general layout , detailed land planning, motor roads and driveways,  land improvement, construction costs.

63

DD  “Arrangement of warning and limiting signalling: at bridge of 802 km of even and uneven tracks of Karagandy – Mointy section, at bridge km 695 of even and uneven tracks of Astana - Karagandy, at bridge km 1744 of Iletsk – Aktobe section”

NC "KTZ" JSC, Mainline System Directorate

2008. Topographic, geodetic and geotechnical works. Construction solutions on signalling, construction costs.

62

DD “Railway siding to electric depot Raiymbek in Almaty city”

Metroproject organization

 

2008. Topographic, geodetic and geotechnical works. Railway tracks, signalling and telecom, power supply and lighting, construction costs.

61

DD “Early civil works for loading-unloading area”. Eskene West Railway Complex project. Kashagan Field Development.

NIPIneftegas JSC – Agip KCO

 

2008. Railway tracks’ roadbed, general layout, detailed planning, intrasite motor roads.

60

Feasibility Study. “Karabatan Mainline Station Development”. Kashagan Field Development. Eskene West Railway Complex.

 

AGIP KCO

2008. Economy, traffic arrangement, railway tracks, stations, wagon facility, signalling and telecom, architecture & construction solutions, motor roads and driveways, general layout, land improvement, construction costs.

59

TPD, DD on “Development of design documents on railway transportation for the 4th line and preliminary documents for the Stage III”

Karachaganak Petroleum Operating B.V.- ABE Corporation

 

2008. Development of documents on disciplines: railway tracks, intrasite motor roads.

58

Feasibility Study to determine capacity of the Kulsary – Aksaraiskaya railway line section (Mangystau oblast) for crude oil and oil products transportation

Tengizchevroil

 

2007. Economy, traffic arrangement, traffic capacity, railway tracks, locomotive and wagon facility, signalling and telecom, construction costs.

57

Feasibility Study “Construction of Zyryanovsk – Maikapchagai railway line”

East-Kazakhstan oblast

“Vostochniy Express КZ” LLP

 

2007. Economy and traffic arrangement, railway tracks, stations, wagon facility, signalling and telecom, architecture & construction solutions, general layout, , motor roads and driveways, land improvement, construction costs, construction arrangement, pay-back and efficiency of investments into the construction.

56

DD “Arrangement of warning and limiting signalling systems at bridge: 117 km of railway section Shemonaikha-Ust-Talovka;

East KazakhstanOblast

“NC “Kazakhstan Temir Zholy” JSC

Mainline Network Directorate

2007. Topographic and geodetic works. Construction solutions on signalling, construction costs.

55

DD “Arrangement of warning and limiting signalling systems at bridge 13 km of Zaschita-Zyryanovsk section;

East KazakhstanOblast”

“NC “Kazakhstan Temir Zholy” JSC

Mainline Network Directorate

2007. Topographic and geodetic works. Construction solutions on signalling, construction costs..

54

DD “Arrangement of warning and limiting signalling systems at bridge 22 km of Zaschita-Zyryanovsk section;

East KazakhstanOblast”

“NC “Kazakhstan Temir Zholy” JSC

Mainline Network Directorate

2007. Topographic and geodetic works. Construction solutions on signalling, construction costs.

53

DD “Arrangement of warning and limiting signalling systems at bridge 177 km of Zaschita-Zyryanovsk section;

East KazakhstanOblast”

“NC “Kazakhstan Temir Zholy” JSC

Mainline Network Directorate

2007. Topographic and geodetic works. Construction solutions on signalling, construction costs.

52

DD “Arrangement of warning and limiting signalling systems at bridge 170 km of Zaschita-Zyryanovsk section;

East KazakhstanOblast”

“NC “Kazakhstan Temir Zholy” JSC

Mainline Network Directorate

2007. Topographic and geodetic works. Construction solutions on signalling, construction costs.

51

DD “Arrangement of warning and limiting signalling systems at bridge 75 km of Zaschita-Zyryanovsk section;

East KazakhstanOblast”

“NC “Kazakhstan Temir Zholy” JSC

Mainline Network Directorate

2007. Topographic and geodetic works. Construction solutions on signalling, construction costs.

50

Construction of a railway crossing at Dossor – Crossing loop No. 414 at 420 km PK, 6 element 3, Atyrau oblast;

Makat – Kulsary – Bebike stage – Crossing loop No. 472 section at 1310 km of PK2, element 3, Atyrau oblast.

Eko Insaat ve Ticaret Ltd. Sti LLC

 

2007. Topographic, geodetic and geotechnical works. Construction solutions on arrangement of rail crossings (signalling and telecom) and access motor roads (plan, profile, roadbed, road pavement, arrangement of traffic safety), construction costs.

49

DD “Encircling railway track to Kyzyltu field in Ereimentauski region of Akmolinsk oblast

 

“Kyzylty”LLP

 

2007. Topographic, geodetic and geotechnical works.   Economy and traffic arrangement, railway tracks, stations, wagon facility, signalling and telecom, architecture & construction solutions, motor roads and driveways, general layout, detailed land planning, land improvement, construction costs.

48

Kashagan Field Development. Eskene West Railway Complex. Atyrau oblast

Mott McDonald Limited

 

2007. Consulting services during FEED stage on the following disciplines: railway tracks, traffic arrangement, locomotive, wagon and track repair facilities, signalling and telecom, general layout and motor roads.

47

DD “Overhaul repair of bridge at even track of PK 3, 8 and 10 km 3374; 3259 and 1098 of Beineu – Mangystau section” Mangystau Oblast

“NC “Kazakhstan Temir Zholy” JSC

Mainline Network Directorate

2007. Topographic, geodetic and geotechnical works. Construction solutions on the bridge, hydrological calculations, cost estimate documents.

46

DD “Overhaul repair of stone arch bridge at PK9, km 1536 of Saryozek – Koskuduk section, Almaty oblast”

“NC “Kazakhstan Temir Zholy” JSC

Mainline Network Directorate

2007. Topographic, geodetic and geotechnical works. Construction solutions on the bridge, hydrological calculations, cost estimate documents.

45

DD “Overhaul repair of culvert at PK 8, km 266, of Beineu – Mangystau section, Mangystau Oblast

“NC “Kazakhstan Temir Zholy” JSC

Mainline Network Directorate

2007. Topographic, geodetic and geotechnical works. Construction solutions on the culvert, hydrological calculations, cost estimate documents.

44

“Topographic survey for “Almatymetrokurylys” station Raimbek, Almaty”

“Zheldorstroy” LLP

2007. Topographic and geodetic works

43

DD “Overhaul repair of crossover on “Detour road to Atyrau”, Atyrau

“PFI Engineering” LLP

2007. Topographic, geodetic and geotechnical works. Construction solutions on the crossover, cost estimate documents.

42

Feasibility Study“Kashagan Field Development.  Development of Karabatan mainline station”

Atyrau oblast

Agip KCO

 

2007. Economy and traffic arrangement, railway tracks, stations, locomotive and wagon facilities, signalling and telecom, architecture & construction solutions, motor roads and driveways, general layout, land improvement, construction costs.

41

Railway Transport Services for Projects of Line 4 and Stage III

Karachaganak Petroleum Operating BV

 

2006

Development of construction options for railway infrastructure (rail tracks, locomotive & railcar facility, electric interlocking, semiautomatic interlocking at railway sidings, correction of centralized control system at abutment to mainline tracks, telecom equipment, main fiber optic cable, station telecom equipment, architectural & construction solutions, power supply, general layout and motor roads, construction costs) within various volumes of oil products’ transportation without consideration of loading-unloading facilities and their infrastructure.

40

Feasibility Study“Eskene West Plant Rail Infrastructure Development”.

Atyrau oblast

Scott Wilson Kirkpatrick

 

2006.  Railway tracks, stations, signalling and telecom, locomotive and wagon facilities, architecture & construction solutions, motor roads and driveways, general layout, land improvement, detailed land planning, construction costs.

39

DD “Construction of engineering structure at km 347, 345 PK 4-9; PK 8-9  Beineu – Mangyshlak section, Mangystau Oblast

NC “Kazakhstan Temir Zholy” JSC

Capital Construction and  Designing Directorate

2006 г. Topographic, geodetic and geotechnical works. Construction solutions on the bridge, hydrological calculations, cost estimate documents.

38

DD “Overhaul repair of bridge at PK 2, km 4 of Beineu – Mangystau section, Mangystau Oblast

NC “Kazakhstan Temir Zholy” JSC

Capital Construction and  Designing Directorate

2006 г.  Topographic, geodetic and geotechnical works. Construction solutions on the crossover, cost estimate documents.

37

DD “Reconstruction of motor road section at km 833-853 of state mainline road “Astrakhan – Atyrau - Aktau”

Atyrau department of Transport Development Committee of the RoK Transport and Communications Ministry

2006. Topographic, geodetic and geotechnical works. Construction solutions on motor road по(layout, profile, roadbed, road pavement, engineering structures, traffic safety arrangement), cost estimate documents.

Architectural and construction solutions on road operation, process solutions, general layout, detailed planning of area, cost estimate documents.

36

Feasibility Study “Construction of the new railway line Zyryanovsk- Maikapchagai”,

East Kazakhstan oblast.

“Vostochniy Express КZ” LLP

 

2006.  Railway tracks, stations, signalling and telecom, locomotive and wagon facilities, architecture & construction solutions, motor roads and driveways, general layout, land improvement, construction costs.

35

DD “Railway siding to

Logistic Center”

Almaty oblast, Burunday village

“Arka Stroy” LLP

2006. Topographic, geodetic and geotechnical works.  Railway tracks, construction costs.

34

Construction of the new railway line Shyngyrlau-Zhaisan on the RoK territory

East Kazakhstan oblast

ABE Corporation

2006. Railway tracks, stations, signalling and telecom, locomotive and wagon facilities, architecture & construction solutions, motor roads and driveways, land improvement, construction costs.

33

Construction of the new railway line Bautino - Mangyshlak

Mangystau oblast, Feasibility Study

“NC “Kazakhstan Temir Zholy” JSC

 

2006. New railway line, stations (railway tracks, stations, signalling and telecom, locomotive and wagon facilities, power supply and lighting, general layout and land improvement, cost estimate documents, economy and construction costs efficiency).

32

TPD, DD “Construction of bus station for 200 passengers in Atyrau”

AGIP KCO

2006. Architectural & construction and process solutions, general layout, detailed planning of area, engineering systems and utilities, power supply and lighting, telecom, driveways and parking, land improvement, cost estimate documents.

31

Construction of the new railway line Bautino - Mangyshlak

Mangystau oblast, Feasibility Study

“NC “Kazakhstan Temir Zholy” JSC

 

2006. New railway line, stations (railway tracks, stations, signalling and telecom, locomotive and wagon facilities, power supply and lighting, general layout and land improvement, cost estimate documents, economy and construction costs efficiency).

30

Detailed design of a railway siding towards “Atyrau Refinery” LLP in Atyrau

“Standart Gas” LLP

 

2005.

Topographic-geodetic and geotechnical surveys.

Construction solutions on arrangement of railway crossing (layout, section, roadbed, road paving, traffic arrangement and safety), crossing signalling system, telecom equipment.

29

Survey works for Agip KCO

Atyrau

AGIP KCO

2005. Topogeodetic survey works, geotechnical works on pipeline routes.

28

Ferronickel Production Project.

Kustanay oblast, Feasibility Study

Beteman Metals Limited

 

2005. Main architecture & construction and process solutions on plant construction, general layout, power supply, construction cost calculation.

27

Construction of motor road for large-size loads transportation.

Atyrau oblast

“Panalpina WT” LLP

 

2005. Topographic, geodetic and geotechnical works. Construction solutions on motor road for transportation of extra-oversized loads (plan, profile, (plan, profile, roadbed, road pavement, traffic safety arrangements), cost estimate documents.

26

DD “Construction of telecom cable at Karabatan Station – Atyrau Station section дляto arrange channels for automated workstations of  for freight officersin Atyrau.

“Temirzhol Kurylys Atyrau” LLP

 

2004. Topographic, geodetic and geotechnical works. Construction solutions on telecom cable (plan, equipment and materials), telecom building, cost estimate documents.

25

Investments Justification “Motor road to Komsomolskoye Field”, Mangystau oblast

“CaspianContractorsTrust” LLP

2004. Construction solutions on motor road по(layout, profile, roadbed, road pavement, engineering structures, traffic safety arrangement), cost estimate documents.

24

DD “Rearrangement of oil pipelines’ crossing with railways at Aktau port”.

“Design institute of transport and communications” “INTRANSCOM” OJSC

2004. Construction solutions on oil pipeline, cost estimate documents

23

Technical support on reconstruction of railway line Aktau port – Kulsary – Tengiz. Mangystau oblast.

“Zheldorstroy” LLP

 

2004. Engineering works

22

DD “Development of design-estimate documents on overhaul repair of reinforced concrete bridge with changing of bridge superstructure on even track of PK 20003+58,80 of Kandyagash – Sekseulskaya section”

“NC “Kazakhstan Temir Zholy” JSC

 

2004. Topographic, geodetic and geotechnical works. Construction solutions on the bridge, hydrological calculations, cost estimate documents.

 

21

DD “Development of design-estimate documents on overhaul repair of bridge on even track of PK 15024+33,00 of Astana – Almaty section”

“NC “Kazakhstan Temir Zholy” JSC

 

2004. Topographic, geodetic and geotechnical works. Construction solutions on the bridge, hydrological calculations, cost estimate documents.

20

DD “Development of design-estimate documents on reinforcement of bridge cones on even and uneven tracks of  PK 19976+48,0 and elongation of bottom edges of bridge abutments at even track of Zhem – Sekseulskaya section”

“NC “Kazakhstan Temir Zholy” JSC

 

2004. Topographic, geodetic and geotechnical works. Construction solutions on bridge abutments and cones, hydrological calculations, cost estimate documents.

19

DD “Development of design-estimate documents on overhaul repair of steel pipe with replacement on reinforced concrete pipe at PK 19349+60,80 of Kandyagash – Zhem section”

“NC “Kazakhstan Temir Zholy” JSC

 

2004. Topographic, geodetic and geotechnical works. Construction solutions on the culvert, hydrological calculations, cost estimate documents.

18

DD “Development of design-estimate documents on overhaul repair of steel pipe with replacement on reinforced concrete pipe at PK 19088+50,40 of Kandyagash – Zhem section”

NC “Kazakhstan Temir Zholy” JSC “

 

2004. Topographic, geodetic and geotechnical works. Construction solutions on the culvert, hydrological calculations, cost estimate documents.

17

DD “Development of design-estimate documents on overhaul repair of reinforced concrete bridge with changing of bridge superstructure at PK 2305+14,30 of Kandyagash – Sagyz section”

NC “Kazakhstan Temir Zholy” JSC “

 

2004. Topographic, geodetic and geotechnical works. Construction solutions on the bridge, hydrological calculations, cost estimate documents.

16

DD “Development of design-estimate documents on overhaul repair of bridge on even track of PK 14877+29,90 of Shyganak – Shu section”

“NC “Kazakhstan Temir Zholy” JSC

 

2004. Construction solutions on the bridge, hydrological calculations, cost estimate documents.

15

DD “Development of design-estimate documents on overhaul repair of reinforced concrete bridge with changing of bridge superstructure on even track of PK 20201+95,80 of Kandyagash – Seklseulskaya section”

“NC “Kazakhstan Temir Zholy” JSC

 

2004. Topographic, geodetic and geotechnical works. Construction solutions on the bridge, hydrological calculations, cost estimate documents.

14

DD “Development of design-estimate documents on overhaul repair of reinforced concrete bridge with changing of bridge superstructure on even track of PK 20034+43,40 of Kandyagash – Seklseulskaya section”

“NC “Kazakhstan Temir Zholy” JSC

 

2004. Topographic, geodetic and geotechnical works Construction solutions on the bridge, hydrological calculations, cost estimate documents.

13

DD “Development of design-estimate documents on overhaul repair of bridge with changing of bridge superstructure at PK160+54,9 of Kandyagash – Shubarkuduk section”

“NC “Kazakhstan Temir Zholy” JSC

 

2004. Topographic, geodetic and geotechnical works. Construction solutions on the bridge, hydrological calculations, cost estimate documents.

12

DD “Development of design-estimate documents on overhaul repair of bridge with changing of bridge superstructure at PK 23 057 14.90, of Kandyagash – Sagyz section”

“NC “Kazakhstan Temir Zholy” JSC

 

2004. Topographic, geodetic and geotechnical works. Construction solutions on the bridge, hydrological calculations, cost estimate documents.

11

DD “TCO Main Assets Development. Detailed designing of rail tracks for unloading of chemical agents and LPG”

Atyrau Branch of “PFD International”

 

2004. Topographic and geodetic works. Rail tracks (roadbed, track superstructure, water discharge, rearrangement of utilities), railway crossings (arrangement, access motor roads to the crossings, traffic safety arrangements).

10

Reconstruction of station building at Dossor station in Atyrau oblast (DD).

AGIP KCO

2004.  Topographic, geodetic and geotechnical works. architectural & construction and process solutions, general layout, detailed land planning, power supply and lighting, engineering systems and utilities, motor driveways, parking, land improvement, cost estimate documentation.

9

Reconstruction of station building at Makat station in Atyrau oblast (DD).

AGIP KCO

2004. Topographic, geodetic and geotechnical works. architectural & construction and process solutions, general layout, detailed land planning, power supply and lighting, engineering systems and utilities, motor driveways, parking, land improvement, cost estimate documentation.

8

TPD, DD "Kashagan Field Development.

Railway siding towards OPF Plant of Agip KCO”, Atyrau oblast

“TKA-Atyrau” LLP(7122) 354606

2003-2004.

Complex facilities on construction of railway siding and its infrastructure:

Railway siding (plan and longitudinal profile, roadbed, track superstructure, engineering structures, signalling and telecom, power supply);

Mainline station Karabatan (track arrangement, roadbed, arrangement of electric interlocking, telecoms, power supply and lighting, Rail Control center, maintenance point, engineering systems and utilities, access motor roads, land improvement);

Industrial station Zavodskaya (Bolashak) (track arrangement, roadbed, arrangement of electric interlocking, telecoms, power supply and lighting, Rail Control center, maintenance point, engineering systems and utilities, access motor roads, land improvement);

Rail Control center in Atyrau (architectural & construction and process solutions on signalling and telecom, power supply and lighting, engineering systems and utilities, motor driveways, land improvement);

Rearrangement of interlocking system at mainline railways (rearrangement of interlocking system, arrangement of telecom, power supply and lighting, construction solutions on office and plant buildings).

7

Detailed Design (DD) ”Construction of shift camp”

“ABE Corporation” CJSC

2002. Architecture and process solutions, engineering systems and utilities (water and heating supply, power supply and lighting, telecom), motor roads of shift camp, general layout, detailed land planning, land improvement and greening, cost estimate documents.

6

Overhead crossing on Makat – Atyrau section of “Karabatan Station.- Crossing loop No. 484” railway stage

“Zheldorstroy” OJSC,

Atyrau

 

2002. Topographic, geodetic and geotechnical works. Construction solutions on arrangement of overhead crossing (signalling and telecom) and traffic arrangement (plan, profile, roadbed, road pavement, traffic safety arrangements).

5

DD  “Recovery of  motor road “Almaty-Gulshad, 43-59 km”

“Zheldorstroy Zhezkazgan Zholdary” LLP

2001. Topographic, geodetic and geotechnical works. Construction solutions on motor road reconstruction (layout, longitudinal profile, widening of roadbed, road pavement, traffic safety arrangements), engineering structures, rearrangement and protection of engineering utilities, cost estimate documents.

4

DD “Design of office and hotel complex”

“TKA-Atyrau” LLP

2001. Architecture & construction, process solutions, general layout, detailed area planning, engineering systems and utilities (HVAC, water supply and sewerage, power supply and lighting, telecom), cost estimate documents.

3

DD. Construction Cost Calculation

“LCPS” LLP

2001. Local, facility calculations, summary cost calculation. Expert conclusion.

2

DD “Construction of main water pipeline with diameter 350;300 mm, L=10,6 km of “Aksai water supply” project from plastic pipes (two lines).

“CNTT” CJSC

2000 г. Topographic, geodetic and geotechnical works. Route, construction solutions, engineering equipment, cost estimate documents.

1

Station Buildings for KPK and Aksai stations, Aksai town

ASMP-1

2000. Topographic, geodetic and geotechnical works. Architecture and construction solutions, general layout, detailed planning of site, access motor roads, land improvement,  cost estimate documents

 

 

 

Director

“Intereng-Almaty” LLP _________________ N. Kuralbayev